
Pull & Bear
Design, supply and installation of heating, ventilation and air conditioning for two Pull & Bear stores.
Hospitality
At Premium Resort in Batllava, Orllan, Install Engineering supplied, installed, tested and commissioned the hotel’s HVAC systems. The project covered heating, cooling, ventilation and domestic hot water.
The project was completed and handed over to the investor in October 2024.
See also our hospitality projects and commercial projects.

Design, supply and installation of heating, ventilation and air conditioning for two Pull & Bear stores.

Samsung DVM S ECO VRF system and heat-recovery ventilation for 950 m².

Samsung DVM S2 VRF system for 4,300 m², with 308 kW heating and 303.2 kW cooling.
Samsung Climate Solutions Authorised partner
Tell us about the space and the schedule. We will come back to you with a proposal and a quote.